Neuqua Valley High School

Project Summary

Total Project Budget: $96.0 Million
Referendum Funds: $90.0 Million
Contracted to Date: $57.9 Million

Neuqua Valley High School opened in 1997 and is the largest of the district’s high schools by enrollment. The district’s master facility plan identified several areas of the facility and mechanical systems needing improvements or replacements. Additionally, the school has received minimal improvements to classrooms and learning environments since opening. The master facility plan also includes designs that will allow all students to attend the main campus for the first time since the early 2000’s. This improvement will allow the district to repurpose the Birkett center for district-wide programming and create operating efficiencies throughout the district.

Comprehensive improvements to Neuqua Valley started in early 2025 with a new chilling system, a renovated student foods lab, and the continuation of parking lot replacements. Additional improvements include:

  • Secure vestibule at the front of the building for checking in all visitors and enhancing security
  • Exterior door replacements and the increased use of electronic access controls
  • Mechanical upgrades and system replacements throughout the building
  • Classroom addition with modern science classrooms, additional math classrooms and blended learning/collaborative spaces
  • Expanded dining area with new furniture to modernize the student dining experience
  • Front addition to enable safety and security improvements, consolidate staff offices, improve access to advisory and intervention services, and create a student commons
  • Numerous improvements to physical education and athletics spaces, including a new fitness studio and installation of turf field
  • A new suite of special education classrooms and offices specifically designed to support diverse learners
  • Redesigned forum rooms to improve flexibility of space
  • Building-wide LED lighting, furniture and classroom technology upgrades 

Budget Dashboard

NVHSCostSummary_0226 (PDF)

Photo Gallery

An empty room featuring dark blue walls, exposed ceiling beams, and windows.

Neuqua Valley - FACS lab renovation

Partially completed indoor space with workers, tools, and exposed ceiling.

Neuqua Valley - FACS lab renovation

A large brick building with a crane, construction equipment, cones, and barriers.

Neuqua Valley - mold removal

An empty parking lot with construction equipment, trees, and background buildings.

Neuqua Valley - parking lot repaving 

A grassy field with construction cones, surrounded by buildings and parking.

Neuqua Valley - parking lot repaving

Photo Gallery - Ground Breaking

A green skid steer sits by shovels on a red carpet outside an %22ACADEMICS%22 brick building.
A man speaks at a podium before a construction site with an excavator and Neuqua Valley banner.
A man in a suit speaks at a podium before a construction site with heavy machinery and a rendering.
People in hard hats stand with shovels in front of an %22ACADEMICS%22 building with a tractor nearby.
People in hard hats stand with shovels in front of an %22ACADEMICS%22 building with a tractor nearby.
People in hard hats hold shovels in front of an %22ACADEMICS%22 brick building, ready to break ground.
People in hard hats break ground in front of an %22ACADEMICS%22 brick building with a loader nearby.
Five people in hard hats hold shovels in front of an %22ACADEMICS%22 brick building with a loader.

Project Plan - Photos and Renderings

A planning concept diagram featuring Common Areas, Staff Resources, and Wings.
Architectural site plan showing campus buildings, parking areas, and green space.
Color-coded floor plan showing a proposed building renovation and room layout.
A typical classroom floor plan showing collaboration zones and classroom spaces.
Color-coded architectural floor plans showing labeled rooms and building spaces.
A proposed two-story building floor plan with labeled rooms and entrances.
A science lab facility floor plan featuring labeled rooms across two levels.
Architectural floor plan of a proposed building renovation with labeled spaces.
Architectural floor plan of a proposed building renovation with labeled spaces.
A modern multi-story building with a glass facade, paved area, and sky view.
A spacious modern dining area with varied seating and a kitchen background.
A modern, open-concept workspace featuring desks and collaborative seating.
Architectural plan featuring a circular green space surrounded by structures.
A conceptual classroom layout diagram showing labeled zones in a diagonal layout.
Architectural floor plan of a proposed building addition with a circular layout.
A modern school campus featuring a paved walkway, buildings, and a clear sky.
Architectural floor plan of a proposed building addition with a circular layout.